Laserfiche WebLink
.~ . <br />Mr. Stout <br />- 3 - February 10, 1988 <br />13) A culvert is needed to continue D2 under the haul road it crosses <br />in order to reach Pond 4. Although WFC does not use these "haul <br />roads" to any great extent at this time, that is the designation <br />and appropriate drainage should be installed. This could he added <br />to the proposal now. As has been mentioned previously, these roads <br />and ditches are in considerable need of maintenance. <br />Hopefully, the proposed plan can incorporate the suggestions made above. <br />Should there be unrecognized problems in doing so, please address these when a <br />new proposal is made. If you have any questions in the meantime, please <br />call. Notice of this decision will be published as soon as possible. <br />Publication will initiate a ten (10) day public comment period. <br />Since rely, <br />.~ any, G ~evQ,w~ <br />James C. Stevens <br />Reclamation Specialist <br />JCS/vjr <br />cc: Bob Liddle <br />5222E <br />