My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-03-14_REVISION - M2000016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-03-14_REVISION - M2000016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:33 PM
Creation date
11/21/2007 12:50:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
3/14/2005
Doc Name
Adequacy Review Response
From
Lafarge West Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~LAFARG E <br />NORTH AMERICA <br />Construction Materials <br />series on one graph or integrated. The Division requests the applicant respond to these <br />inquiries and also submit revised graphs. <br />The Groundwater Elevation Graphs in Appendix B were sepazated between irrigation and non- <br />imgation season because the Division had requested the sepazation on Lafazge's most recent <br />permit application. Irrigation versus non-irrigation seasons were determined by the months <br />during which the ditches deliver water. The data is collected in the same manner in each season, <br />however the data were split to illustrate consistent seasonal data. A revised set of graphs <br />illustrating integrated, non-seasonal data is attached. <br />20. "Operational Losses, Table 3 "needs to specify what years these depletions occur, or <br />corresponding phases of the operation, including reclamation. Water projected to be <br />consumed by the concrete batch plant, for mitigation purposes, or other uses must be <br />included. <br />"Operational Losses, Table 3" intentionally reflected the depletions in mining yeazs rather than <br />calendaz yeazs to allow for flexibility in the mining start date. The table has been modified to <br />reflect the corresponding phases. Water used by the concrete batch plant, for mitigation <br />purposes, and other uses will be reviewed by the OSE during the SWSP renewal. <br />21. The applicant must comply with Rule 6.4.7(4), which states that they "shall indicate the <br />projected amount from each of the sources of water to supply the project water <br />requirement for the mining operation and reclamation. " <br />Please see attached response from Applegate Group, Inc. <br />22. The SWSP approval letter dated Apri12, 2001, submitted with the application for the Fort <br />Lupton Gravel Pit (M--1985-088) portion of the amended permit area, expired on March <br />31, 2003. The applicant must demonstrate current compliance with OSE requirements <br />for this exposed ground water surface. <br />Please see attached response from Applegate Group, Inc. <br />23. The applicant must submit a copy of the Well Permit for the currently permitted <br />Riverbend Operation to demonstrate current compliance with OSE requirements. <br />Please see attached response from Applegate Group, Inc. <br />24. The applicant should note that the flow rates from the two discharge points in the current <br />CDPS Permit authorization (COG-500416) are limited to 1, 000 GPM each (1.44 MGD). <br />LAFARGE NORTH AMERICA INC. -Lafarge Aggregates, Concrete & Asphalt <br />10170 Church Ranch Way, Suite 200 Westminster, Colorado 80021 <br />Telephone: (303) 657-0000 Facsimile: (303) 6574037 <br />
The URL can be used to link to this page
Your browser does not support the video tag.