Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 10/15/2004 <br />User: BMK <br />State :Colorado PermiUjob# : M-1981-044 <br />County :EI Paso Abbreviation :none <br />Site :Solberg Pit Filename : M044-001 <br />Agency or organization name :DMG <br />Permit or otherjob action :AMENDMENT <br />Task description :ROUGH GARDE 25 ACRES <br />,;:, <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.14 NA <br /> Operating wsUhour : $69.76 100 <br /> Ripper op. cosUhour : $4.98 50 <br /> Operator cosUhour : $31.83 NA <br /> Total unit wsUhour : $157.71 Total fleet cosUhour : x157.71 <br />;:: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 19,840 LCY factor : NA volume : 19,840 LCY <br /> <br />Source of estimated volume :EXHIBIT D <br />Source of estimated swell factor :NA <br />_.::: , <br />HOURLY PRODUCTION <br />Job Condition Correction Factors ;; <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiH/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.96 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,400 Ibs/LCY Net correction : 0.60 <br />Weight description <br />Sand -Dry, loose Adjusted unit production : 239.60 LCY/hr <br /> Adjusted Fleet production : 239.60 LCY/hr <br />_..: <br />JOB TIME AND COST ,, <br />Fleet size : 1 Dozers) Total job time : 82.81 Hours <br />Unit cost : $0.658 /LCY Total job cost : x13,060 <br />Horsepower : 310 <br />