My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-15_REVISION - M1981044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981044
>
2004-10-15_REVISION - M1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:33 PM
Creation date
11/21/2007 12:49:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
Revision
Doc Date
10/15/2004
Doc Name
Warranty Calculation
From
DMG
To
David Whitehead
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 10/15/2004 <br />User : BMK <br />State :Colorado Permitfjob# : M-1981-044 <br />County :EI Paso Abbreviation :none <br />Site :Solberg Pit Filename : M044-002 <br />Agency or organization name : DMG <br />Permit or otherjob action :AMENDMENT <br />Task description :APPLY 6 INCHES OF TOP SOIL OVER 25 ACRES <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 24,200 LCY <br />Basic machine :Cat D8R Series ll - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br /> Utilization <br />Ownershipcost/hour : $51.14 NA <br />Operating cosUhour : $69.76 100 <br />Ripper op. cost/hour : $4.98 50 <br />Operator cosUhcur : $31.83 NA <br />Total unit cosUhour : $157.71 Total fleet cost/hour <br />$157.71 <br />Swell Loose <br />factor : NA volume : 24,200 LCY <br />Source of estimated volume : EXH/BIT D <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUdayJ <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.96 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,400 Ibs/LCY Net correction : 0.60 <br />Weight description <br />Sand -Dry, loose <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 310 <br />Total job time <br />Total job cost <br />Shift basis : 1 perday <br />Data source : (CRG) <br />239.60 LCY/hr <br />239.60 LCY/hr <br />101.00 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.