Laserfiche WebLink
Table No.-2 <br /> Coulson Excavating Company,Inc. <br /> Challenger Pit <br /> Substitute Supply Plan-Operational Losses <br /> Pam' <br /> Month <br /> AriVYYYY ,'.W •.?�9'i Z'r i�ti. ..}''.. _ p;i <br /> Jan 1.0% 1000 0.03 0.02 70.05 1.07 1.12 <br /> Feb 2.0% 2000 0.06 70.04 .10 1.34 1.44 <br /> Mar 6.0% 6000 0.18 0.12 .30 1.78 2.08 <br /> Apr 9.0% 9000 0.26 0.18 .44 2.90 3.34 <br /> May 13.0% 13000 0.38 0.26 0.64 3.53 4.18 <br /> June 16.0% 16000 0.47 0.32 0.79 4.95 5.75 <br /> July 17.0% 17000 0.50 0.34 0.84 5.62 6.46 <br /> Aug16.0% 15000 0.44 0.30 0.74 5.16 5.90 <br /> Sept 9.0% 9000 0.26 0.18 0.44 3.71 4.16 <br /> Oct 7.0% 7000 0.21 0.14 0.35 2.37 2.72 <br /> Nov 4.0% 4000 0.12 0.08 0.20 1.38 1.58 <br /> Dec 1.0% 1000 0.03 0.00 0.03 1.07 1.10 <br /> Total 100% 100000 2.94 1.90 4.92 34.91 39.83 <br /> Total Material Mined= 100,000 tons Total Depletion= 39.83 <br /> Moisture Content= <br /> Dust Control = 2.0 ac-ft <br />