Laserfiche WebLink
accordance with Rule 6.4.19 of the Construction Material Rules and Regulations or <br />provide an appropriate engineering evaluation that demonstrates that such structures <br />shall not be damaged by activities occurring at the mining operation. <br />6. NCCI will need to revise the bond estimate for phases (as initially proposed) or for <br />the total lining of the pit. If a phased approach is proposed, then the operator will <br />need to commit to reclaiming the site as mining progresses to ensure that enough <br />bond money exists to cover the cost of reclamation. The Division will re-evaluate the <br />amount of required bond based on current labor and equipment rates. <br />Please be advised that Division's decision due date is set for November 9, 2006. If you feel <br />more time is needed to complete your reply, the Division can grant an extension to the decision <br />date. This will be done upon receipt of a written waiver of your right to a decision by November <br />9, 2006 and request for additional time. This must be received no later than the deadline date. If <br />you have any questions, please contact me at (303) 866-4943. <br />Sin r ly, <br />~~ <br />ros y <br />Environmental Protection S ialist <br />cc: Cazl Mount; DMG <br />Todd Yee, J&T Consulting, Inc. <br />