Laserfiche WebLink
The revegetated azea will be monitored for success of reclamation until accepted by the Division. If <br />•) revegetation failures occur prior to release, an analysis of the site will be made and the azea will be <br />revegetated again as necessary. <br />9. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local SCS office in Park County to assist in detemuning <br />the ability of the reclaimed land to control erosion. If minor changes or modifications aze needed to <br />the seeding and reclamation plan, revision plans will be submitted to the Division as required. It is <br />hoped that the Division will provide assistance in evaluating the success of the ongoing reclamation <br />process. All azeas disturbed and reclaimed and any other important items regazding the reclamation <br />will be submitted in the annual reports to the Division. <br />~~ <br />• Alma Placer 7/03 52 <br />