My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-03_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2003-09-03_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:31 PM
Creation date
11/21/2007 12:48:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
9/3/2003
Doc Name
Amendment Application
From
Ducommun Business Trust
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 8.5 acres of processing azea (Assume 15,000 cy) <br />- 5.5 acres azound final pit lake (Assume 26,000 cy) <br />•' -1.5 acres miscellaneous disturbance in tank storage azea, etc. (Assume 4,000 cy) <br />- 2.5 acres azound Pond #2 azea and fill Pond #2 (5,800 cy) <br />- 600 linear feet of 8' high berm along Highway 9, spread over 2.0 acres, (2,840 cy) <br />Total azea to be smoothed or graded: 20.0 acres. The total volume to be moved in smoothing <br />(grading) is 53,640 cy. <br />It is expected that all of the area smoothed will be topsoiled in addition to the camp area of 3.4 <br />acres, therefore, the total to be topsoiled is 23.4 acres. This acreage is also the total to be seeded <br />and mulched at the end of the mine life. <br />The spreading of fines will occur from Fines Piles #2 and #3, located neaz the processing plant <br />azea. A thickness of 3" over 23.4 acres is a volume of 9,438 cy. This volume will be spread over <br />the designated areas with a small dozer to minimize compaction. <br />The reclamation timetable is given below, assuming that all cuts have economic viability and <br />t will be mined. <br />Task # Description Time Needed <br />in months <br />1 Stdp Initial overburden from Cut 1 and place to the <br />northeast. Regrade this northeast azea. 1.0 <br />2 Mine Cut 1. Create new Pond A. 0.5 <br />3 Mine Cut 2. Very little overburden. 1.0 <br />4 Create 8' gravel berm along Highway 9 ROW 0.5 <br />5 Create Ponds 1,2,3,4 on southwest comer of permit azea 1.0 <br />6 Strip overburden from Cut 3 and place in Cut 1. Move <br />Pond A back to Cut 2 azea. 1.5 <br />7 Mine cuts 4-47 stripping and replacing topsoil & <br />overburden in the previous cut. 64.5 <br />L~ <br />Alma Placer 7/03 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.