Laserfiche WebLink
\ <br />r <br /> <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />ill 3 Sherman SL., Room 215 <br />Denver, CO 80203 <br />Phone: 130]1866-7567 <br />FA%: 13031 832-8106 <br />November 15, 1993 <br />Mr. Gary Aanisch <br />418 Main Street <br />Walsenburg CO 81089 <br />RE: Trinidad Basin Mine Reclamation, Trinidad Basin Mining Company, <br />Revoked Permit No. C-81-048 <br />Dear Mr. Hanisch: <br />oF' cO<o <br />ti~+ <br />Nei c~ <br />re~a <br />Roy Romer <br />Governor <br />Michael B. Long <br />Divivon Diretlor <br />I just wanted to take this opportunity to follow up on the conference telephone call held last <br />week between you, me, Colorado Assistant Attorney General Steve Brown, and Frank <br />Bartlett of Trinidad Basin Mining Company. <br />I have enclosed, per your request, a copy of the letter transmitted from our offices to the <br />Department of Administration reganfing the collection of $10,750.00 in outstanding civil <br />penalties owed the State of Colorado by Trinidad Basin Mining Company. <br />With regard to your office's questions about the development of a final rechunation plan for <br />the Trinidad Basin Mine, the Division met wiW Mr. Frank Bartlett and Mr. Greg Lewicki, <br />representatives for Trinidad Basin Mining Company, on September 1, 1993 at the mine site. <br />At the conclusion of that inspection, the Division and Trinidad Basin Mining Company were <br />in agreement as to what would be recLLimed, save for three ponds situated along an access <br />road in Section 22, and with possible illegal mining disturbances in Section 15. <br />Since that meeting the Division has determined that the disturbances in Section 15 are not <br />attributable to Trinidad Basin Mining Company, and as such will not be reclaimed with <br />monies from the forfeited Trinidad Basin Mining Company bonds. The Division has further <br />determined that leaving the access road into Section 22 as it is now, with some minor <br />repairs, rather than recon5guring it to the contours of the hillside, will reduce the cost of the <br />reclamation, while at the same time leave ponds for use by livestock and wildlife per the <br />approved post-mining land use. This cost reduction will further afford the Division the <br />opportunity to better address the realignment of the north-flowing surface water runoff that is <br />currently impacting We Del Agua bridge. <br />~ubl~~ ~'urr~s~,~n.i~,,.:. <br />STATE OF COLORADO <br />Leaving the road embanl®ents across the two drainages in the east half of Section 22 will <br />necessitate the development of a slope stability analysis by an independent subcontractor, to <br />