Laserfiche WebLink
_2_ <br />CORRECTIVE ACTIONS <br />1. Require the operator and/or landowner to secure an approved Construction Material <br />110 Extraction permit by May 24. 1996 (30 days from presentl. <br />Note: The operator has stated that he does not intend to continue mining at the site, but to <br />only conduct reclamation. <br />CIVIL PENALTY (C.R.S. 34-32.5-123) <br />1. Require the operator and/or landowner to pay a minimum civil penalty in the amount of <br />$1,000.00, based on 30.0 hours to staff time at $33.30/hour. <br />2. If the Board finds the operation to be an illegal Construction Material Extraction <br />Operation, the Board should also assess the operator and/or landowner a civil penalty of <br />not less than $1,000.00 per day nor more than $5,000.00 per day for each day the land <br />has been affected, not to exceed 365 days. <br />a. In this case, the Office recommends that the Board find 214 days of <br />violation at $1.000.00 per day. <br />b. The total civil penalty of $215.000.00 (Nos. 1 & 2) is due 30 days from the <br />date of the signed Board Order. <br />c. The Office recommends that $200.000.00 of the total civil penalty be <br />suspended, if corrective actions are completed by May 24. 1996 (30 daXs <br />from present). <br />r' ^ S P~ <br />('~' u <br />~ ~5 ~e, r-~( . <br />~;,.., G; QV~q ~~iOKt, ($ ~.~ws/ G14. ~a sv`~~~.auc¢.s w,..¢a,~. '®- l <br />/f~,~,p,4- ~~j c~vw,v Sa~•cp~t~. C/0, (~~..~ Bcdb`„~ w~oV}". <br />(vim'. lv•~^'lw(,n.~ ~olr ~C ~ ~co: I~wavrl:w~i ~ /fib:( Sopw. <br />Ji~/~'' ~ 4,u4,t( ~i" ~,~,~• .~'. ~,,,, ~ yon da ~t- ; aJ-Gi-~ <br />auk; Vial ,~' g~ ord... ,~'1) <br />Ue~~ <br />~`..,i,tl.. <br />~~ <br /> <br /> <br />~• e~ <br />L <br />~~=~,: P~s4~~.pP7 <br />~. <br />a~ s lc ~,{-. -z.i;l:, w,,.i~~ ~ ~ ~..,.,,.,`r'-~.,,,,~ Lr: loo0 6 3o s <br />