My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30710
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:44 PM
Creation date
11/21/2007 12:44:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Enforcement
Doc Date
11/10/1998
Doc Name
Settlement Agreement for CV-98-007
Violation No.
CV1998007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o~ '-~< <br />`~ ~~~~ g COLORADO DIVISION OF LvIINERALS AND GEOLOGY <br />•\~J^~' • 1313 Sherman Street. Room 215. Denver, Culorsdo 80303, f_03) 866-3567 <br />• /9)~+ <br />SETTLEMENT AGREEiViENT <br />NOV/CO NO.: CV-98-007 <br />MINE: Deserado Ivline <br />PERMIT NO.: C-81-018 <br />DATE ISSUED: August 6, 1998 <br />TYPE OF MINE: undergound/Federal <br />O PERATOR/PERNII'I'TEE: <br />Blue Mountain Energy, Inc. <br />ATTENTION: Scott Wanstedt <br />ADDRESS: 3607 County Road 65 <br />Rangely, CO 8 (648 <br />COUNTY: Rio Blanco <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil Penalty, <br />and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The requested <br />conference having been held as required by law, on October 26, 1998 the Division and the operator hereby agree as <br />follows: <br />The amount of the penalty shall be $0.00. <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from the date this <br />Agreement is signed by all parties; <br />Payment of such penalty by the operator shall constitute a waiver of all further rights to review <br />of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The fixed <br />penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, 34-33- <br />123(8)(a). <br />OPERATOR: DATE: <br />By <br />DNISION OF MINERALS AND/GEOLOGY: ' / <br />By G ~ DATE: ~/.~.~ ~ i99~ <br />Confer facer <br />By Penalty Adjustment Reviewed <br />Division Director [Rule S.oa.3(a)(c)J <br />CRS 3d-33-I?3(8)(c) and (d) <br />h11055\PMFI\TEM1IfV1 V61018.1BM <br />
The URL can be used to link to this page
Your browser does not support the video tag.