My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-18_REVISION - M1998013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-06-18_REVISION - M1998013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:32 PM
Creation date
11/21/2007 12:43:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
6/18/2003
Doc Name
Amendment and all Subsequent Revisions
From
BLC Development Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _-~ <br />Engineer has stated that prior to these various uses of ground water, the applicant will need to <br />obtain either a gravel pit or other type of well permit, as applicable.,'However, prior to obtaining <br />a permit, an approved water supply plan or decreed plan for augmentation is required. Please <br />indicate how compliance will be be achieved with Rule 3.1.6(1)(a~regazding Colorado water <br />laws and regulations governing injury to existing water rights. Please see attached comments <br />from the Office of the State Engineer. <br />2. Page 30 of the application lists 10 shallow alluvial wells that occur within 600 feet of the <br />proposed operation. Megan Sullivan of the Office of the State Engineer has stated that prior to <br />approving a well permit, the applicant must document the locations of all wells within 600 feet of <br />the permit azea and obtain a waiver of objection from all well owners with wells within 600 feet <br />of the permit azea or request a hearing before the State Engineer. Please indicate how <br />compliance will be achieved with Rule 3.1.6(1)(a) regazding Colorado water laws and <br />regulations governing injury to existing water rights. Please see attached comments from the <br />Office of the State Engineer. <br />Exhibit J -Vegetative Information <br />1. As required by Rule 6.4.10, please indicate if there aze any noxious weeds present within the <br />proposed 309.83 acre permit azea. If so, you will be required to provide a weed control plan for <br />the noxious weed(s) present in order to achieve compliance with Rule 3.1..10 (6). Please see <br />attached comments from the Longmont Soil Conservation District. <br />2. As required by Rules 6.4.7(4) and 6.4.10(1)(a), please indicate~if there aze any wetlands <br />within the proposed 309.84 acre permit azea:,' If so, please revise the Existing Conditions Map to <br />include the location of any wetland(s) and provide a description of how potential impacts to these <br />azeas will be minimized. Please see attached comments from the U.S. Army Corps of Engineers. <br />Exhibit L -Reclamation Costs <br />Page 38 of the application lists a total reclamation cost of $228,000 for a maximum allowable <br />disturbance of 45 acres at any one time. T'he Division concurs with this estimate. However, in <br />view of comment number 1 under Exhibit E - Reclamatio Plan, please be advised that bonding <br />costs may change depending on adequacy review responses. <br />Exhibit S -Permanent Man-Made Structures <br />Page 1 of the application lists six (6) laterals and irrigation ditches that meander through the <br />property. The Division considers each of these laterals and irrigation ditches to be a permanent <br />
The URL can be used to link to this page
Your browser does not support the video tag.