Laserfiche WebLink
PHASE VI <br />ITEM DESCRIPTION UNIT OUAN. UNIT <br />PRICE TOTAL <br />1 Mobd¢atron -:45 n,. LS ~ $ 2.000 00 <br />2 Grading and Sloprng CY 24,830 $ 2.00 _ 49.600 00 <br />3 Place Top Sort CY 23,130 1.50 34.695.00 <br />4 i Seed, Mulch, Tack. 8 Fertile <br />' AC 18 125-00 2.250.00 <br /> A)_ <br />Pit Floor_{TYPE r_ <br />5 'Seed. Mulch. Tack, & Fertilize <br />' AC 3 420,00 t ,260 00 <br /> Srde Slopes (TYPE <br />B <br />• _. <br />-- - <br />- <br /> Subtotat $89,805 00 <br />6 .Indirect Costs LS 2,695 00 <br /> Subtotal 92, 500 00 <br />7 Protect Management LS 6.285 00 <br /> TOTAL PHASE VI 98,785.00 <br /> PHASE VII <br />ITEM DESCRIPTION UNIT OUAN. <br />_ UNIT <br />PRICE TOTAL <br />1 . Mobil¢atpn <45 mr LS $ 2,000.00 <br />2 Gradrg and Sloprng CY 0 $ 2 00 0 00 <br />3 Place T'op Sod CY 7,350 1.50 11,205.00 <br /> <br />4 Seed Mulch. Tack. 8 Fertile <br />' <br />' <br />AC <br />7 : <br />125.00 <br />875 00 <br /> Prt Floor ITYPE <br />A <br />) <br /> <br />5 Seed. Mulch, Tack, 8 Fertilize <br />' <br />' <br />AC <br />0 <br />420.00 <br />0 00 <br /> .Side Slopes {TYPE <br />S <br /> Subtotal $14.080 00 <br />6 Indrrect Costs LS 425 00 <br /> Subtotal 14.505.00 <br />7 Protect Management LS ~ 985 00 <br /> TOTAL PHASE 11 15.490.00 <br />TOTAL ALL PHASES = 5639,837.00 <br />a <br />Rev 00!1(1793 <br />