Laserfiche WebLink
PHASE IV <br />ITEM ~ DESCRIPTION <br />_ _ UNR I QUAN. ~ UNR <br />PRICE TOTAL <br />t Mobd¢atron <45 mi LS S 2.000.00 <br />2 1 Grading and Stop~ng CY <br />~ 11,300 S 2.00 22.600 00 <br />3 Place Top Sod CY 27,910 1.50 41,865.00 <br />4 ~ Seed, Mulch, Tack. 8 Fertilize <br />" <br />" AC 16 125.00 2.00.00 <br /> Pq Floor (TYPE <br />A <br />} <br />1 <br />5 Seed, Mulch, Tack, 8 Fertilize <br />" <br />' AC 1 420.00 ' 420 00 <br /> .Side Slopes (TYPE <br />) <br />8 _ <br /> I Subtotal ~ 566.887 OD <br />6 ,Indirect Costs LS 2,000,00 <br /> Subtotal 68.687 00 <br />7 ~ Project Management LS 4.680 00 <br /> TOTAL PHASE IV ~ 73,567.00 <br /> PHASE V <br />ITEM DESCRIPTION UNIT OUAN. PRICE TOTAL <br /> <br />1 Mobd¢abon <45 m. LS S 2.000 00 <br />2 Gradrng and Sloping I CY 70.595 S 2.00 21.190 00 <br />3 .Place Top Sod ~ CY 22,900 1.50 34.350.00 <br /> <br />4 Seed. Mulch, Tack, 8 Fertile <br />' <br />AC <br />19 <br />125.00 <br />2.375.00 <br /> Pd Floor (TYPE'A <br />Z <br />5 _ <br />Seed. Mulch, Tack, 8 Fertdae <br />' <br />' AC 2 420,00 840 00 <br /> . Sbe Slopes TYl PE <br />6 <br />)_ <br /> Subtotal 560,755 00 <br />6 Indirect Costs LS 1,825.00 <br /> sumotal szsoo Do <br />7 Protect Management LS ~ 4,250 00 <br /> TOTAL PHASE V 66,850.00 <br />3 <br />Rer 08r10A3 <br />