My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 12:40:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/11/2003
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_~ -Golder <br />ASSOClc'1.~eS <br />February 4, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />RECEIVED <br />FEB..1 1 2003 <br />Division of Minerals and GeolOsr <br />RE: Summary No. 9: January 19 through February 1, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Pdb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of January 190i <br />through February 151, 2003. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 10° F to 29° F, and highs ranged from 35° F to 48° F. Snow was recorded <br />on January 280i, 2003. Weather observations were made on ten days of this two week reporting <br />period <br />Construction Svnonsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on ten days of this fourteen day <br />reporting period (January 200i through January 240', and January 270' through January 315` ). <br />Construction activities conducted during this reporting period are shown in site maps of Phase IVb and <br />1Vc, located in Attachment A. <br />Phase IVb <br />Ames continued hauling and placement of Low Volume Solution Collection Fill (LVSCF) in Phase <br />1 Vb. Ames utilized a Caterpillar 330 excavator with a bar attachment to taper the crest and shoulder <br />area of the in-place LVSCF material. Hauling and placement of the LVSCF in the Phase IV PSSA <br />azea was completed for the season on January 24th, and will resume in the spring of 2003. <br />Golder Associates Inc. <br />44 Union $oulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.