Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 07/11/2006 <br />User : ESC <br />agency or organization name :DMG <br />Permit or other job action :Reevaluate Amount of Required Bond <br />Task description : Bac~ll 8 Grede Waste Piles Into Pit to Achieve 3h:1 v Slope <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 15,000 <br />State :Colorado <br />County : Larimer <br />Site :Berthoud Sunset <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br /> Utilization <br />Ownership cosUhour : $54.80 NA <br />Operating costlhour : $75.29 100 <br />Ripper op. cosUhour : $2.03 20 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $164.65 Total fleet cosUhour <br />LCY <br />$329.30 <br />Swell Loose <br />factor : NA volume : 15,000 LCY <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted howdy production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (fshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net conection : 0.27 <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth Adjusted unit production : 173.15 LCY/hr <br /> Adjusted Fleet production : 346.31 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.951 /LCY <br />PermiUjob# : M-1994-080 <br />Abbreviation :none <br />Filename : M080-001 <br />8SU Horsepower: 310 <br />Total job time : 43.31 Haurs <br />Total job wst : $14,263 <br />Shift basis : 1 per day <br />Dafa source : (CRG) <br />