Laserfiche WebLink
CIRCES Cost Estimating Software <br />'ROJECTIDENTIFICATION / ~-~Cf9~-~g(~ <br />Date : 11 ~1u1-2006 `~ Permit or job no.: Site :8erthoud Sunset <br />User : ESC Abbreviation : none State :Colorado <br /> Filename : M080-000 County :Ladmar <br /> Agency or organization name :OMG <br /> Permit or job action :Reevaluate Amount of Required Bond ~ ~- O I ~ <br />ASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Bac1,~11 & Grade Waste Piles into Pit to Achieve 3h:1 v Slopes dozer 2 43.31 $14, 263 <br />002 -Rip Compacted Areas ripper 1 8.7 $1,507 <br />003 -Replace6"-f0"ofSoilover5Acres dozer 1 18.5 $3,017 <br />004 -Revegetate Disturbed Areas (5 Acres) revege 1 40.0 $6,262 <br />005 -Mobiliza0on/Demobilization mobilize 1 5.3 $3.806 <br />inGudes inMatlon taclor adjusMent of : NA °h <br />SUBTOTALS: 115.9 <br />TOTAL DIRECT COST <br />OVERHEAD AND PROFIT - Liability IDSUranCe : 2.02 % Of direct total = $583 <br />Performance bond : 1.05 % of direct total = $303 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o/direct total = $2.886 <br />'not requin3d (or eqp. aperatw serves as super.) TOTAL O & P = $3,771 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - CONTRACT AMOUNT (direct t O 8 P) _ $32,626 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work antl/or contracUbid preparation : NA NA NA total = NA <br />R I ti <br />ec ama on management and/or admlmstratlon . 5.00 % ofcntr NA total = $1,631 <br />CONTINGENCY- NA• NA total= NA <br />'rnnfinpencies accounted ror at task level TOTALINDIRECT COST= $5,903 <br />TOTAL BOND AMOUNT (direct + indirect) _ $34,758 <br />