My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-15_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-15_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 12:36:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/15/2003
Doc Name
Weekly Const. Report
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~° =Golder <br />-Associates <br />July 1, 2003 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303} 980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company RECEIVED <br />P.O. Box 191 <br />27ss state xighway 67 1UL 15 1003 <br />Victor, CO 80860 <br />Division of Minerals and Geology <br />RE: Summary No. 23: June 25 through June 28, 2003 <br />Cresson Project Phase 1Vb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Ina. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of June 25 <br />through 28, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 42° F to 46° F, and highs ranged from 71° F to 82° F. Weather <br />observations were made on four days of this four-day reporting period. <br />Construction S,, i~ns?s <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase PJb <br />construction. Ames conducted Phase IVb and c construction activities on four days of this four-day <br />reporting period (June 25 through 28). Poly-Flex conducted Phase IVb construction activities on three <br />days of this four-day reporting period (June 25, 26, and 28). <br />Phase IVb <br />Ames conducted slope re-contouring and re-compaction in the Phase IVb OSA on Substation Hill, west <br />and upslope of the PSSA. <br />Ames continued excavation of the Phase IVb OSA geomembrane anchor trench near the LOB fie-in, <br />excavating approximately 1001ineaz feet of anchor trench in prepazafion for geomembrane deployment. <br />Ames exposed approximately 601ineaz feet of geomembrane liner at the Phase PJb PSSA by removing <br />a previously placed Drain Cover Fill (DCF) access road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.