Laserfiche WebLink
QUANTITY TYPE OF EQUIPMENT QUANTITY TYPE OF <br />EQUIPMENT <br />I Generator set 1 Concrete Batch Plant <br />I Primary Crusher 1 Concrete Casting <br />Facility <br />I Secondary Crusher 1 Fuel Tank <br />50 Conveyors 1 Aggregate Wash Plant <br />3 Back Hoes 1 Shop Building <br />1 Mechanic Truck 1 Office Trailer <br />15 Scraper 1 Water Truck <br />3 Compactors 3 Pickups <br />3 Dozer 2 Portable Toilets <br />2 Road Grader 15 Ready-mix trucks <br />Traffic (addresses USR Questionnaire, Items #8.6, #8.d) <br />Please refer to the attached `Traffic Impact Study' prepared by Eugene Coppola, P.E. for a <br />detailed description of the traffic related to the mining operation. As identified in Section IILB. <br />of the Study, the site will generate 2140 vehicle trips per day during high season demand. The <br />Study concluded that the "trips can be easily managed" and that the Riverbend facility "will not <br />adversely impact the area street system." <br />Lafarge Wes(, /nc.. -Riverbend <br />Weld Caunry USR Permit <br />Page l7 of 4( <br />