My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-07-13_REVISION - M2000016 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-07-13_REVISION - M2000016 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:31 PM
Creation date
11/21/2007 12:36:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
7/13/2005
Doc Name
weld county referral
From
weld county
To
lafarge
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Silts generated by the mining process can be utilized to create diverse wetlands and <br />add diversity to the habitat along this portion of the river corridor. <br />• There are existing and planned oil and gas facilities on the site. There may be an <br />opportunity to work with the oil and gas companies to enhance the appearance of <br />the facilities. <br />• There is limited overburden on this site. However, excess material can be used as <br />much as possible to vary the slope and configuration of the open water ponds to <br />create more irregular shorelines <br />Post-Mining Land Use <br />Portions of the Site are within the 100-yeaz floodplain of the South Platte River. Weld <br />County Department of Panning Services considers land located in the 100-year floodplain <br />to be suitable for agriculture, recreation, and wildlife uses. The post-mining land use, as <br />proposed in this Reclamation Plan, consists of water storage and open water for <br />recreational purposes. <br />Phase 1 Cell 2, Phase 2 Cells 1 and 2, Phase 3 Cell 1, and a portion of Phase 5, Cell 3 will <br />be used for silt storage and reclaimed as wetlands. Phase I Cell 1, Phase 4 Cell 1, and the <br />Plant Site azea will be reclaimed as water storage facilities. All remaining cells will be <br />reclaimed as unsealed groundwater ponds. All other disturbed areas will be vegetated with <br />a native seed mix, as recommended by the Soil Conservation Service (see Upland Areas <br />Seed Mix on the Reclamation Plan). These uses are compatible with the surrounding land <br />uses and with the Weld County planning goals. <br />For both the lined and unlined ponds, Lafazge will concurrently reclaim pit walls where <br />mining has been completed according to the phases outlined in the Mine P-an. The silt <br />storage ponds will be reclaimed as soon as they are filled, according to the phases outlined <br />in the Mine Plan. Reclamation, including regrading and seeding, will be completed in two <br />to five years following the completion of mining or filling operations. The mining will <br />leave no highwalls on the property. No acid forming or toxic materials are used or <br />encountered in the mining. There will be no auger holes, adits, or shafts left on the site. <br />Equipment (addresses USR Questionnaire, Items #l.a) <br />The following equipment will be used on site. <br />Table 2. <br />Equipment <br />QUANTITY TYPE OF EQUIPMENT QUANTITY TYPE OF <br />EQUIPMENT <br />3 Loaders 1 Scale House <br />I Wash deck 2 Portable crushers <br />l Portable screen 1 Asphalt Batch Plant <br />Lafarge Wes(, Inc.. - Riverbend <br />Weld County USR Permit <br />Page 16 oJ41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.