Laserfiche WebLink
sheet 1 of 2 <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />009 State :Colorado PermiUjob # : M-2002-052 <br />05/29/2003 <br />KAP <br />Abbreviation :none <br />Filename : M052-009 <br />Permit or other job action :Technical Revision <br />Task description :spread stockpiled shale onto pit sideslopes and compact <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 623G <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :CAT 815E <br />County :Weld <br />Site :Two Rivers Pit <br />Road maintenance -Motor grader :NA <br />-Water truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA compact NA misctruk <br />Utilization-machine : 100 NA NA 100 NA 100 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cost/hour : $48.31 NA NA $44.95 NA $7.61 <br />Operating cosUhour : $85.65 NA NA $41.48 NA $11.94 <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />Operator cosUhour : $30.84 NA NA $30.65 NA $24.14 <br />Unit subtotals : $164.80 NA NA $117.08 NA $43.69 <br />Number of units : 1 0 0 1 0 1 <br />Group subtotals : Work : $164.80 Support : $117.08 Maintenance : $43.69 <br />Total work team cost/hour : $325.56 <br />:> ., ,. ., <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 31,205 CCY <br />factor : 1.165 volume : 36,354 LCY <br />Source of quantity take-off : Based on Mine Plan map with a maximum of 5 acres distrubed <br />Source of estimated swell factor :swell factor for clay <br />