My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-29_REVISION - M2002052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002052
>
2003-05-29_REVISION - M2002052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 10:47:17 AM
Creation date
11/21/2007 12:33:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002052
IBM Index Class Name
Revision
Doc Date
5/29/2003
Doc Name
Cost Summary Form
From
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION ~~~~sheet 2 of.2,. <br />Hauling Capacity <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis <br />Material weight : 2,100 pounds/LCY <br />Material description <br />Shale <br />Rated payload : 55,000 pounds <br />Payload capacity : 26.19 LCY <br />Struck volume <br />Heaped volume <br />Average volume <br />Adjusted capacity <br />18.00 LCY <br />23.00 LCY <br />20.50 LCY <br />20.50 LCY """ <br />hourly production reFlects volume per scraper pair on push-pull models <br />Cvcle Time : Job Condition Corrections : Site altitude (ft.) : 4,730 <br /> Scraper Push dozer Source <br />Scraper loading time' : 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 NA (Cat HB) <br />• loatl time per scraper pair on push-pull models Net COffeCflOn : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)"" <br />1 200 30.00 5.00 35.00 173 1.16 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.16 minutes <br />Return route <br />" [ravel time for each segment is adjusted for acceleration/deceleration Return tlme : U.49 mIOU[eS <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.25 minutes <br />Unadjusted unit production/hour : 378.34 LCY/hour ""• Adjusted for job conditions : 314.02 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 314.02 LCY/hour <br />Adjusted multiple scraper team (Fleet) hourly production : 314.02 LCY/hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.