Laserfiche WebLink
Gregory M. Nagel, P. <br />Coaaulting Engineer <br />Mork fiieter~ <br /> <br />Febniary 1, 1972 Research aid employed by the College of Engin~erlna, <br />to University of Illinois, Urbana. <br />February 3, 1973 <br />This work coaslstad of designing aid teetiryl tunnel liver aysbas, <br />One of tlw systssa was wire-fiber rsiaforced concrete. Mix deaigza <br />was evaluated, After preparing s trial six, I perforeed teats for <br />air •ntraittsent, caRpresaiw strength, sluap test, aM flexure strength. <br />February 14, 1973 Structural ent¢ near asployed by Clothier b Yet~r <br />to Architects, 155 (teat Lake Avenue, Colorado Springs. <br />January 1, 1974 <br />I designed part of the foundations for Crested Butte Developsent Cor~poa- <br />tion projects. I worked closely with the soil engineers to design f'or <br />high rater table and alluvial soil co~itione. I also designed the <br />structural floor sad roof syatasa for the convention center, ledges, <br />cotdosiniuss, affi shops at Crested 9utte. <br />January 1, 1974 Design F,ngimer II eaployed by Stearr-s-Roger <br />to Architects, P. 0. Box 5888. Daarer. Colorado, <br />Decesber 1, 1974 <br />At Stearns-Roger the scope of ^y work broademd to include the design oY <br />institutional aM irrluatrial projects. I dasigaed cable vaults std <br />drilled pier foundations, steal bents, roof, floor, and fou~ation syatess. <br />In addition to design work I checked vendor shop draxiuga and design work <br />on other projects. I also sada quantity take-offs and prepared cost <br />estisatee for different design eysteaa, <br />Decet+ber 1, 1974 Project construction engineer employed by the <br />to Monsanto Cospany, 800 N. Li~bergh, St. Louis, <br />September 1, 1979 Missouri. <br />For nearly five years I eianaged construction at field locations. <br />'Phe projects consisted of pipelines, fire protection, service buildings, <br />process units, rests treatment potds, site developaeat and high <br />voltage distribution syateas, Capital costs range betwaea :~2 and <br />~£13 million. I xas responsible for caking and updating the con- <br />atruction schedule, bid letting std regotiatioas, anti coortiiaating <br />contactor-r. I also performed cost estimtea during the project <br />for design changes and additions. <br />Septeaber 1, 1979 Self-employed consulting engineer. <br />to <br />Presently <br />fn Colorado Spricgs, I have cospleted engineering assigrawnts oa the <br />E1 Paso County Auditoriums, school buildings, a fire station, office <br />buildings, cuatos and tact hoses, an industrial building, aid outer <br />structural projects, The projects vary frog full servios to ,fast <br />designated services, some of this work was dom on a contract basis <br />with Morgan std Aaeociatas, and Hoxard Dutt1 affi Aasociates. <br />