Gregory M. Nagel, P.
<br />Coaaulting Engineer
<br />Mork fiieter~
<br />
<br />Febniary 1, 1972 Research aid employed by the College of Engin~erlna,
<br />to University of Illinois, Urbana.
<br />February 3, 1973
<br />This work coaslstad of designing aid teetiryl tunnel liver aysbas,
<br />One of tlw systssa was wire-fiber rsiaforced concrete. Mix deaigza
<br />was evaluated, After preparing s trial six, I perforeed teats for
<br />air •ntraittsent, caRpresaiw strength, sluap test, aM flexure strength.
<br />February 14, 1973 Structural ent¢ near asployed by Clothier b Yet~r
<br />to Architects, 155 (teat Lake Avenue, Colorado Springs.
<br />January 1, 1974
<br />I designed part of the foundations for Crested Butte Developsent Cor~poa-
<br />tion projects. I worked closely with the soil engineers to design f'or
<br />high rater table and alluvial soil co~itione. I also designed the
<br />structural floor sad roof syatasa for the convention center, ledges,
<br />cotdosiniuss, affi shops at Crested 9utte.
<br />January 1, 1974 Design F,ngimer II eaployed by Stearr-s-Roger
<br />to Architects, P. 0. Box 5888. Daarer. Colorado,
<br />Decesber 1, 1974
<br />At Stearns-Roger the scope of ^y work broademd to include the design oY
<br />institutional aM irrluatrial projects. I dasigaed cable vaults std
<br />drilled pier foundations, steal bents, roof, floor, and fou~ation syatess.
<br />In addition to design work I checked vendor shop draxiuga and design work
<br />on other projects. I also sada quantity take-offs and prepared cost
<br />estisatee for different design eysteaa,
<br />Decet+ber 1, 1974 Project construction engineer employed by the
<br />to Monsanto Cospany, 800 N. Li~bergh, St. Louis,
<br />September 1, 1979 Missouri.
<br />For nearly five years I eianaged construction at field locations.
<br />'Phe projects consisted of pipelines, fire protection, service buildings,
<br />process units, rests treatment potds, site developaeat and high
<br />voltage distribution syateas, Capital costs range betwaea :~2 and
<br />~£13 million. I xas responsible for caking and updating the con-
<br />atruction schedule, bid letting std regotiatioas, anti coortiiaating
<br />contactor-r. I also performed cost estimtea during the project
<br />for design changes and additions.
<br />Septeaber 1, 1979 Self-employed consulting engineer.
<br />to
<br />Presently
<br />fn Colorado Spricgs, I have cospleted engineering assigrawnts oa the
<br />E1 Paso County Auditoriums, school buildings, a fire station, office
<br />buildings, cuatos and tact hoses, an industrial building, aid outer
<br />structural projects, The projects vary frog full servios to ,fast
<br />designated services, some of this work was dom on a contract basis
<br />with Morgan std Aaeociatas, and Hoxard Dutt1 affi Aasociates.
<br />
|