Laserfiche WebLink
RECLAMATION COSTS <br />EXHIBIT L <br />The worst case reclamation scenario occurs when Phase 2 is mined out and the largest azea of the site <br />needs to be reclaimed. At this time, the Phase 1 azea will have been topsoiled, but all other <br />reclamation will be needed. The following work will be needed to complete the reclamation: <br />1) Do final grading of Phase 2 area. This could involve the backfill of up to 15,000 cubic yazds of <br />overburden into the pit. <br />2) Rip all bench areas above the lake. (4.3 acres) <br />3) The upper portion of the Phase 21ake portion (1.4 acres) and the bench areas (4.3 acres) will need <br />7" of topsoil replacement. This is an azea of 5.7 acres. <br />4) After placement, the soil will be disced or roughened prior to seeding. <br />5) Seed the wetland fringe of 15 feet width and 4600 feet length. This is 1.6 acres. <br />6) Allow the lake to fill and regrade the settling pond and dischazge ditch. <br />7) Seed and mulch the 4.3 acres of benches and upper dryland portion of the lake (2.8 acres) with <br />the dryland seed mix and 30001b mulch per acre. <br />North R-34 Pit 1/07 <br />36 <br />