My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-24_REVISION - M1992054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992054
>
2006-01-24_REVISION - M1992054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:40 PM
Creation date
11/21/2007 12:26:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992054
IBM Index Class Name
Revision
Doc Date
1/24/2006
Doc Name
Adequacy Review Response
From
Matt Carnahan LBCR LLC
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E - A (revised) Reclamation Plan (6.4.5) <br />(2) <br />(a) It is the intent of the landowner/operator to reclaim the affected area to <br />meet the criteria for rangeland development. With the exception of the <br />110 permit area, reclamation efforts will remain consistent throughout <br />all phases and are discussed as follows: <br />The type of reclamation proposed for the mine phases is to replace <br />the mined area with 1' - 2' of overburden and 6" of topsoil where <br />available. The post-mining slope along mining limits and will be <br />regraded to no less than a 3:1 slope ratio. The method proposed to <br />replace overburden and topsoil will involve slot dozing the <br />respective material from atop the western and peripheral mining <br />boundaries. The area will then be graded to meet the post-mining <br />development requirements. Reclamation contours are shown on <br />Exhibit F. The total mined area to be reclaimed is approximately 90 <br />acres including 9.9 acres within the existing 110 permit boundary. <br />The area comprising the mine property and the surrounding lands are <br />primarily agricultural. The properly is bound on the north, west and south <br />by lands of the Southern Ute Tribe. <br />(b) Implementation of the Reclamation Plan pursuant to Section 3.1 is <br />described as follows: <br />The lands on which mining will take place are owned by the <br />Operator/ Applicant. It is the desire of the landowner to reclaim the <br />mining phases such that it can be utilized as rangeland. <br />Erosion and siltation will be controlled throughout the reclamation <br />process such that lands outside of the affected area will not be <br />impacted. Methods to be employed include effective stormwater <br />impoundment, siltation and erosion control devices. <br />Neither refuse nor acid-forming nor toxio-producing materials are <br />expected to be mined. Should any of these materials be <br />discovered, they will be handled and disposed of in an acceptable <br />manner at the cessation of mining. <br />(c) Within all phases where topsoil is encountered, it will be removed and <br />placed in segregated berms along the perimeter of each mining cell as <br />depicted on Exhibit C. As discussed earlier, topsoil will be revegetated <br />and maintained until it is replaced post-mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.