My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-24_REVISION - M1992054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992054
>
2006-01-24_REVISION - M1992054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:40 PM
Creation date
11/21/2007 12:26:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992054
IBM Index Class Name
Revision
Doc Date
1/24/2006
Doc Name
Adequacy Review Response
From
Matt Carnahan LBCR LLC
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.,~, <br />Exhibit E -Reclamation Plan <br />It is the intent of the applicanUoperator to place overburden and accompanying topsoil <br />stockpiles such that haul distances for replacement at the outset of phased reclamation are <br />minimized. For replacement haul distances longer than 300 feet, earthmovers (scrapers) <br />may be employed. Within 300 feet, front-end loaders andlor dozers will be utilized. <br />It is proposed that the minimum reclaimed depth of material overlying the sandstone <br />bedrock will adequately provide for sustainable revegatation, inclusive of material left in- <br />situ, replaced overburden and 6" of topsoil. <br />The existing N/S roadway will remain after reclamation. Mining Phase perimeter <br />roadways will also remain. Interior phase access roads will be reclaimed in the course of <br />post-mining reclamation. <br />In consult with local experts, the proposed seed mix has been revised. It is attached as <br />amended Exhibit E -Reclamation Plan (Exhibit E -A). <br />Exhibit F -Reclamation Man <br />Should mining occur where the existing irrigation line lies, this line will be relocated as <br />necessary. Reclamation contours as depicted on Exhibit F remain valid. This irrigation <br />line, as discussed eazlier, is owned exclusively by the applicantloperatorllandowner, <br />LBCR, LLC. <br />Revisions to Exhibit F showing perimeter roads to remain aze attached as Exhibit F-A. <br />Any improvements made to the existing N/S roadway, as necessary, will remain after <br />reclamation. <br />Stormwater control structures created during mining will not remain post-reclamation. <br />The reclamation Phase C contour lines in question have been revised on Exhibit F-A. <br />As discussed above, it is not known to what extent mining will occur west of the buried <br />irrigation line. <br />With the exclusion of the existing 110 pit floor, all affected azeas will be revegetated. <br />Exhibit G -Water Information <br />More information and clarification regarding stormwater control management plans is <br />included in Exhibit G - A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.