Laserfiche WebLink
l q <br />B. NOV C-86-047 (Continued) <br />Stipulation Na. 13 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE AND PRIOR TO ANY <br />DISTURBANCE, THE APPLICANT MUST SUBMIT TO THE DIVISION FOR <br />DESIGNS FOR THE WEST DITCH ADEQUATE TO PASS THE FLOWS FROM <br />24-HOUR STORM. THE DESIGNS MUST BE APPROVED IN WRITING BY <br />PRIOR TO THIS STIPULATION BEING SATISFIED. <br />Stipulation No. 15 <br />ADDITIONAL <br />APPROVAL <br />A 10-YEAR, <br />THE DIVISION <br />BEFORE THE PERMANENT POND DESIGN CAN BE CONSIDERED ADEQUATE, THE <br />APPLICANT MUST JUSTIFY THE USE OF A CURVE NUMBER OF 72. THIS MUST BE <br />DONE WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 16 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST PROVIDE <br />THE DIVISION WITH DETAILED POND OUTFLOW CALCULATIONS DEMONSTRATING THAT <br />THE 12-INCH DIAMETER PRINCIPAL SPILLWAY WILL NOT DEWATER THE MAJORITY OF <br />WATER IN THE SEDIMENT POND BEFORE 24-HOURS FOLLOWING A DESIGN STORM. IF <br />THESE CALCULATIONS SHOW AN INADEQUATE HOLDING TIME, THE PRINCIPAL <br />SPILLWAY/DEWATERING DEVICE MUST BE REDESIGNED, AND RECONSTRUCTED WITHIN <br />60 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 18 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST SUBMIT TO <br />THE DIVISION FOR APPROVAL A DETAILED PLAN FOR MONITORING THE SEDIMENT <br />POND pH AND TREATING THIS WATER IF NECESSARY. THE TREATMENT PLAN SHOULD <br />INCLUDE THE TYPE AND AMOUNT OF REGEANT TO BE UTILIZED, METHOD OF <br />APPLICATION, AND WHEN AND HOW THE PLAN WILL BE IMPLEMENTED. <br />