Laserfiche WebLink
Attachment I <br />NOV C-86-045 <br />Stipulation No. 7 <br />WITHIN SIXTY (60) DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT <br />DETAILED DESIGNS FOR BACKFILLING AND GRADING. THESE SHALL ADDRESS <br />REPLACEMENT OF THE EXISTING OVERBURDEN AT THE SOUTHEAST CORNER OF THE <br />PERMIT AREA ALONG THE HIGHWALL WITHIN THE FACILITIES AREA. ALL SLOPES <br />WITHIN THE DISTURBED AREA SHALL BE NO STEEPER THAN 3V:1H. THE PLAN SHALL <br />ADDRESS HOW THE POST-MINING CONFIGURATION MEETS THE REQUIREMENTS OF <br />APPROXIMATE ORIGINAL CONTOUR, AND BLENDS WITH THE SURROUNDING <br />TOPOGRAPHY. THE PERMITTEE WILL SUPPLY CROSS-SECTIONS OF THE PROPOSED <br />POST-MINING TOPOGRAPHY ON 200 FOOT CENTERS THROUGH THE DISTURBED AREA. <br />THE PERMITTEE SHALL ALSO PROVIDE A REVISED POST-MINING TOPOGRAPHY MAP <br />WITH MAXIMUM FIVE-FOOT CONTOUR INTERVALS. THE REQUIREMENTS OF THIS <br />STIPULATION WILL BE SATISFIED ONLY UPON WRITTEN APPROVAL BY THE DIVISION <br />TO THAT EFFECT. <br />Stipulation No. 8 <br />WITHIN SIXTY (60) DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL PROVIDE A <br />PLAN FOR DIVISION APPROVAL DISCUSSING PLACEMENT OF COAL FINES DURING <br />RECLAMATION, AND DISPOSAL OF TRASH AND NON-COAL WASTE. <br />B. NOV C-86-047 <br />Stipulation No. 10 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST SUBMIT TO <br />THE DIVISION FOR APPROVAL, A PLAN FOR RECLAMATION OF THE COAL GULCH <br />DIVERSION AND PLANS FOR RE-ESTABLISHMENT OF THE PERMANENT POST-MINING <br />COAL GULCH CHANNEL. THE DESIGNS MUST BE APPROVED IN WRITING BY THE <br />DIVISION PRIOR TO THIS STIPULATION BEING SATISFIED. <br />Stipulation No. 11 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST SUBMIT TO <br />THE DIVISION A PLAN FOR EROSION CONTROL OF THE TEMPORARY COAL GULCH <br />DIVERSION ADEQUATE TO HANDLE THE VELOCITIES OF THE 10-YEAR, 24-HOUR <br />STORM. THIS PLAN MUST BE APPROVED PRIOR TO IMPLEMENTATION. <br />Stipulation No. 12 <br />THE APPLICANT MUST SUBMIT ADEQUATE DESIGNS FOR THE CULVERT CONVEYING <br />FLOWS FROM THE COAL GULCH DIVERSION UNDER THE HAUL ROAD WITHIN <br />THIRTY (30) DAYS OF PERMIT ISSUANCE. THESE DESIGNS MUST BE APPROVED BY <br />THE DIVISION PRIOR TO ANY HAUL ROAD CONSTRUCTION. <br />