Laserfiche WebLink
Rule 2.05.3 (8) -Continued <br />Energy Fuels has not constructed and does not plan to construct any <br />coal processing waste or non-coal processing waste banks, dams or <br />embankments nor any other type of processing waste storage facili- <br />ties. All coal is simply crushed at the tipple and loaded onto <br />trains with no other processing occurring. For this reason Rule <br />2.05.3 (8) does not apply to this application. <br />(9) Underground development waste <br />A narrative and appropriate maps and cross-sections prepared to <br />meet the standards of 2.10, describing the proposed disposal methods and <br />sites for placing underground development waste and excess spoil gene- <br />rated at surface areas disturbed by surface operations and facilities, <br />according to 4.09. Each plan shall describe the geotechaical investiga- <br />tion design, construction, operation, maintenance, and removal, if <br />appropriate, of the structure and be prepared in accordance with 2.05.3 <br />(6)(b), (c) and (d). <br />Except for the excess spoil already in the permanent overburden <br />stockpile in Section 24, there will be no additional excess spoil <br />and therefore no new designated disposal area will be necessary. <br />Some underground development waste will occur as a result of one to <br />two feet of roof of the underground mine being removed to enhance <br />stability. However, this rock viii be disposed of in the mined out <br />pit at the surface mine to achieve the approximate original con- <br />tour. This mined out pii is referred to as the "Water Retention <br />and Roof Rock Disposal Pit" on `lap 6, Energy `line No. 3 Kine Plan. <br />Z.OS - 32 <br />