<br />the pipeline installed in 1987 for this purpose. At a location 45 feet below County Road No. <br />52, the water line enters the portal of the Time mine's adit, which passes beneath the County <br />Road, and extends 395 feet in a southeasterly direction, A 3 foot thick concrete bulkhead was <br />constructed in the Time mine, and this has created sufficient water storage capacity for winter <br />milling operations. A well will be drilled from the surface to draw water from the Time mine <br />workings. The necessary submersible pump, water line, and electrical connection will be <br />made between the mill building and the approved underground water storage area prior to <br />commencing milling operations. <br />In order to insure that future unpermitted dischazges of water do not occur from the <br />Gold Hill Miil's tailings pond, the following measures have been taken. The two inch ball <br />valve that controls the flow of water from the pond through the decant line has been placed in <br />a locked wooden box. Another two inch ball valve has been installed at the dischazge end of <br />the line inside the Hazel A mine workings. This will require that two valves be opened in <br />order to drain any water from the tailings pond into the underground storage area behind the <br />Hazel A mine's bulkhead. In addition, the three decant stand-pipes will be maintained in <br />working order, and they will be positioned at a height that does not allow the entire amount of <br />water in the pond to drain through the decant line. This will prevent the inflow of such lazge <br />volumes of water into the Hazel A mine that any water overflows the bulkhead. <br />Measuring tapes have been connected to the first stand-pipe in the tailings pond, and on <br />the pipe connected to the submersible pump in the Hazel A mine so that water levels can be <br />monitored. During milling operations, the water level in the tailings pond will be monitored <br />every two or three hours, and the water level in the Hazel A mine checked once a shift when <br />water is being decanted to or pumped from the Hazel A mine. If no water is being circulated <br />from the pond to the Hazel A mine and back to the mill, then the water level will be checked <br />on a weekly basis to insure that a sufficient underground water storage area exists to <br />accommodate a sudden increase in the water level in the tailings pond due to excess rainfall or <br />snowmelt. <br />The excess water that accumulates in the tailings pond will be decanted from the water <br />pool and stored underground in the Hazel A mine adit. This decantation line will be used to <br />control the water level in the tailings pond, and to keep the water pool as far as possible from <br />the crest of the embankment. Additional sections of pipe will be connected to the three <br />stand-pipes to regulate the elevation of the water pond as the tailings dam's height is increased. <br />2 <br />