My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29819
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:44 PM
Creation date
11/21/2007 12:23:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990070
IBM Index Class Name
Enforcement
Doc Name
Documents distributed prior to hearing
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07J08/2004 15:13 19703822515 LAMBERT ASSOCIATES PAGE 05 <br />PN: D04155GE <br />3uly 8, 2004 <br />Page 3 <br />- Upon completion of the field and -aboratory wont the results will bei analyzed and a <br />geotechnical engineering report will be prepared. Our report will present geotecbrtical <br />engineering slope s[abitiry analysis for the conditions encountered including the following: <br />Slope stability analysis of the current slope configuration, <br />A discussion of the results of the analysis and aspects of the site which tray influence the <br />slope stability, <br />A discussion of potential mitigation techniques for the observed conditions. <br />- It should be noted that due to the steepoesa and extensive size of the area influenced that a <br />technically and economically feasible mitigation for the observed conditions may not be <br />available. <br />- Our analysts and suggespons and recommendations will be based on the subsoil and ground <br />water conditions encountered a»d on our experience with similar soil conditions. , <br />- The data generated during our field and laboratory studits will also be presented in our <br />geoteehnical engineering report. <br />- Our study will not address environmental or geologic hazard issues <br />Our scope of work does not include the design of actual slope support or retaining structures. <br />We are available to proceed with the scope of services outlined upon your authorization, upon site <br />access, and upon availability of our drill rig. We anticipate about two (2) to three (3) weeks advance <br />notice to schedule our Geld crew. The field study will take approximately Otte (1}day to cottgrlete. <br />We can discuss our findings and recotnnicndatioits wirer the appropriate personnel prior ro the <br />completion of our written report. The report will be issued approximately thirty (30) working days after <br />the completion of the field study. , <br />The fees for our geoteebnical engineering study outlined above wiD be S7g60.00. This fee includes <br />drill rig service fees to advance the test borings. The fee also includes laboratory tests, geotecFaiical <br />engineering analysis, preparation and submittal of our initial report. This fee does not indtrde addiriona! <br />costs due for additional consultatirm due to the review process by the State.of Colorado. Our fee <br />includes four (4) copies of our report. Additional copies will be invoiced at E75.00 per copy. <br />We will make every reasonable effort to access your project site. Site and weather.conditions may <br />create difficult access characteristics. Fees associated with exaacting our equipment are not included _ <br />with this proposal. ' <br />We will store all soil samples not tested for fifteen (]5) days after submittal bf our report: Pttrthei <br />storage of the samples can be made of your request although there may be additional costs involved. All <br />of our data and reports shall remain the proptrry of Lambert and Associates. <br />~1.FCYI:i~TEYt ixn~ ~Sl]S:CFXfE53 <br />CONSUL7INC CtteTaCHNI CAL ENCINEER5 AND <br />MA7EAIALS 7fiSIINti <br />
The URL can be used to link to this page
Your browser does not support the video tag.