Laserfiche WebLink
requirement of Section 3.1; <br />(d) -Where applicable, plans for topsoil segregation, preservation, and replacement; for stabilization, <br />compaction, and grading of spoil; and for revegetation. The revegetation plan shall contain a list of the preferred <br />species of grass, legumes, forbs, shrubs or trees to be planted, the method and rates of seeding and planting, the <br />estimated availability of viable seeds in sufficient quantities of the species proposed to be used, and the proposed <br />time of seeding and planting; <br />(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan or <br />schedule shall not be tied to any specific date but shall be tied to implementation or completion of different <br />stages of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br />(i) An estimate of the periods of time which will be required for the various stages or <br />phases of reclamation; <br />and <br />out. <br />(ii) A description of the size and location of each area to be reclaimed during each phase; <br />(iii) An outline of the sequence in which each stage or phase of reclamation will be carried <br />(The schedule need not be separate and distinct from the Reclamation Plan, but may be incorporated therein J <br />(f) A descripfion of each of the following: <br />(i) Final grading -specify maximum anticipated.slope gradient or expected ranges thereof; <br />planting; <br />(ii) Seeding -specify types, mixtures, quantities, and expected time(s) of seeding and <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />(iv) Revegetation -specify types of trees, shrubs, etc., quantities, size and location; and <br />(v) Topsoiling -specify anticipated minimum depth or range of depths for those areas <br />where topsoil will be replaced. <br />EXHIBIT F -Reclamation Plan Map (Rule 6.4.6): There is a diagram showing some of the reclamation tasks <br />to be performed on an azea, but it is not a reclamation map. The map(s) of the proposed affected land, by all <br />phases of the total scope of the mining operation, shall indicate the following: <br />(a) The expected physical appeazance of the area of the affected land, correlated to the proposed <br />mining and reclamation timetables. The map must show proposed topography of the area with contour lines of <br />sufficient detail to portray the direction and rate of slope of all reclaimed lands; and <br />(b) Portrayal of the proposed final land use for each portion of the affected lands. Please review the <br />map standards contained in Rule 6.2.1(2) for this and all other maps. <br />EXHIBIT K -Climate (Rule 6.4.111: Provide a description of the significant climatological factors for the <br />locality. You may find this information available at the local NRCS office. <br />EXHIBIT S -Permanent Man-Made Structures (Rule 6.4.19): You must provide information sufficient to <br />