My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-01-04_REVISION - M1986165
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986165
>
2001-01-04_REVISION - M1986165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2021 8:24:32 PM
Creation date
11/21/2007 12:21:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986165
IBM Index Class Name
Revision
Doc Date
1/4/2001
Doc Name
WILLOW BEND PN M-1986-165 APPLICATION FOR SUCCESSION OF OPERATORS
From
DMG
To
DAVID D DILLON
Type & Sequence
SO1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> COST SUMMARY FORM <br /> PROJECT IDENTIFICATION <br /> Date : 20-Sep-2000 Permit or job no. : M-1986-165 Site : Willow Bet Y Pit <br /> User: RCO Abbreviation : none State:Colorado <br /> Filename: M165-000 County:La Plata <br /> Agency or organization name:DMG <br /> Permit or job action :Final reclamation-scheduled bond review <br /> TASK LIST(DIRECT COSTS) FORM FLEET ASK DIRECT <br /> NO. TASK DESCRIPTION _. l-0.USED SIZE HOURS COST <br /> 001 -Grade and rip affected area (2 ac) of permit, incl road dozer 1 12.841 $1,317 <br /> 002 -Revegetate per approved plan (upland area and road) revege 1 12.0 $966 <br /> 003 -Noxious weed control(thistle) 0.5 ac revege 1 4.0 $194 <br /> 004 -Mobilize reclamation equipment to site mobilize 1 2.5 $1,147 <br /> SUBTOTALS:L 31.41 $3,618 <br /> includes inflation factor adjustment or: NA % TOTAL DIRECT OST•_ $3,618 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT- Liability insurance: 1.55 %of direct total = $56 <br /> Performance bond : 1.05 %of direct total = $38 <br /> Job superintendent: NA- NA NA total = NA <br /> Profit: 10.00 %of direct total = $362 <br /> not required(or eqp.operator serves as super.) TOTAI O a P= $456 <br /> CONTRACT AMOUNT(direct+08 P)= $4,074 <br /> PROJECT MANAGEMENT- <br /> Engineering work and/or contract/bid preparation : NA NA NA total = NA <br /> Reclamation management and/or administration : 5.00 %of cntr. NA total = $204 <br /> CONTINGENCY- NA' NA total = NA <br /> contingencies accounted for at tasklevel TOTAL INDIREC COST= $660 <br /> TOTAL BOND AMOUNT(direct+ ind rect)_ $4,278 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.