Laserfiche WebLink
§2.03 APPLICATION FOR PERMIT FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS: MIN- <br />IMUM REQUIREMENTS FOR LEf,AL, FINANCIAL, COMPLIANCE AND RELATED INFORMATION. <br />• <br />3.8 Permit Term Information contd. <br />(2)cont'd. would he transported through the rock slope entries by <br />conveyor belt to the existing coal processing and <br />truck-loading facilities at the Orchard Valley Mine. <br />CWI proposes to begin construction of the rock slope <br />portals and entries on June 15, 1987, and would com- <br />plete the entries to the First West Mains intersection <br />by April 15, 1988. No change in the permit term and <br />long-term mine plan or sequence is proposed and only <br />the new rock slope entries would be added. Refer to <br />revised Map 2-5 for the projected mining dates. <br />2.03.9 Personel Injury and Property Damage Insurance Information <br />No change. <br />2.03.10 Identification of Other Licenses and Permits <br />(1-4) The coal handling facilities of the Orchard Valley P1ine <br />have several existing emissions permits from the Colo- <br />rado Department of Health. flJ[ has submitted an e~nis- <br />. sions permit application for the rock slope entries <br />construction activities to the Colorado Oepartment of <br />Health. <br />Disturbance from the construction of the rock tunnels <br />would he within the existing disturbed area of the Or- <br />chard Valley Mine. No increase in the size of the dis- <br />turbed area shown on Map 8-4 in the existing approved <br />permit and no increase in sedimentation pond volumes <br />would be required. Discharge from sedimentation pond <br />#4 is authorized per CWI's existing NPDES permit. <br />2.03.11 Identification of Location of Public Office for Filing of Application <br />No change. <br />2.03.12 Newspaper Advertisement and Proof of Publication <br />See the proposed public notice attached. <br />• <br />2 <br />