Laserfiche WebLink
i~ <br /> 6 <br />I <br /> 1 during the impoundment phase, but subsequently, the <br /> 2 top surface of that could and should be modified so <br /> 3 th <br />'t <br />t it d <br />- <br />t <br />b <br />i <br />d <br /> a <br />oesn <br />presen <br />an o <br />v <br />ous man <br />ma <br />e <br /> 4 intrusion of that scale on the landscape. <br /> 5 I am not competent to do a stability <br /> 6 analysis, but i believe that the analyses that I <br /> 7 have read did not look specifically at the question <br /> 8 of the stability of the upstream raises in Stage 2, <br /> 9 which will be built. Of course, the initial Phase 1 <br /> to lif <br />i <br />i <br />i <br />i <br /> s on ex <br />st <br />t <br />ng so <br />l, but -- <br /> 11 (Brief interruption.) <br /> 12 THE WITNESS: What are we supposed to <br />' 13 do, evacuate? <br /> 14 THE CHAIRMAN: Go ahead with your <br /> 15 presentation until we find out -- <br />' 16 THE WITNESS: I hope I have your <br /> 17 undivided attention. <br />' 18 THE CHAIRMAN: -- until we see smoke. <br /> 19 THE WITNESS: I can certainly understand <br /> 20 if your attention were divided. <br /> 21 I think these are questions which should <br />1 b <br />i <br />f <br />t <br />di <br />i <br />A <br />ll k <br /> 22 scuss <br />s we a <br />now, <br />ven some <br />ur <br />her <br />on. <br />e g <br />' 23 upstream tailing dam construction is something that <br /> 24 requires much closer scrutiny. <br /> 25 THE CHAIRMAN: Phil, it is a fire drill. <br /> AGREN, BLANDO b BILLINGS <br /> <br />