~ III IIIIIIIIIIIIIIII ~ <br />STATE OF <br />DIVISION OF MINERALS AND GEOLOGY <br />Dcpanmenl of Natural Resources <br />1 713 Sherman 51., Room 215 <br />Denver, Colorado 60203 <br />Phune: 0031 866]567 <br />FA%: (3071 83 2-61 06 <br />December l5, 1997 <br />To: H. Bruce Humphries, James Stevens <br />From: James Dillie <br />Re: Final Abatement of NOV M-92-026, San Luis Project, M-88-112 <br />II~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. lochhead <br />Executive Duecmr <br />MichaelB Lung <br />Dwnion Director <br />BMRI was issued a NOV (M-92-026) in April, 1992. The Board assessed a civil pena~ry (which was <br />paid) and ordered 12 violation abatement requirements. In addition, the Board issued ur interim Board <br />Orders; two in June, 1992 and two in July, 1992. Following is a status and progress report of the <br />abatement requirements: <br />Increased tailings area security: Status; Tailings area security was discontinued when WAD <br />cyanide levels dropped below 10 ppm (and pH levels were below 9.0). Tailings area security <br />has not been re-initiated because WAD cyanide levels have remained below l0 ppm and pH <br />levels have never exceeded 9.0 since security was discontinued <br />2. Assessment of environmental impact: Status; Satisfied. BMRI submitted an $cceptable report <br />April 13, 1992. <br />3. Accelerated frequency of environmental monitoring: Status; Implemented. iii-weekly <br />monitoring continues at the tailings and collection ponds. <br />4. Tailings cyanide detoxification: Status; Completed. BMRI utilized Cytox, Hydrogen Peroxide <br />and the Inco process to reduce cyanide levels in the tailings and collection ponds. As of <br />November 5, 1997, WAD cyanide levels were 0.123 ppm in the tailings pond and 0.029 ppm <br />in the collection pond. <br />5. Leak detection system effluent containment: Status; Implemented. BMRI cot•;mtitted to repair <br />the primary liner at the collection pond if a leak is detected. To date, no IeaIF has been <br />detected. <br />6. Cyanide detection, interception, containment and remedial treatment: Status; Completed. <br />BMR[ submitted TR-08, TR-09 and TR-IS to abate this requirement. <br />Modification of ore processing methodology: Status; Completed. BMRI initiated the Inco <br />process in October, 1992. <br />8. Modification of tailings area reclamation plan: Status; Satisfied. The Board end Division was <br />concerned that the introduction of high cyanide concentrations into [he tailings impoundment <br />would modify the tailings chemical constituency which may require a modi cation of the <br />reclamation plan for the tailings. Therefore, BMRI was required to submit a reclamation <br />