Laserfiche WebLink
<br />completion and pump or slug test procedure..." to the Division prior to well <br />installation and to submitting to the Division all pertinent information <br />including water quality data, driller's lags, and well <br />completioninformation..." upon well completion. The Division has not received <br />any of this information. <br />C. Soil Substitute Stockpiles <br />Peerless Resources committed during a stipulation response letter (page 2, <br />point 5, dated December 30, 1985) to seed, with the approved reclamation seed <br />mixture, the stockpiles "...during the first planting season which will be in <br />the Spring of 1986". <br />Minor Revision No. 4 <br />This revision pertains to modifications in the drainage control system of the <br />Coal Gulch Mine. The Division deemed this revision incomplete on February 24, <br />1986, due to insufficient information. A memorandum from John Doerfer was <br />attached to this incomplete letter specifying the additional, necessary <br />information required to obtain completeness. On March 18, 1986, the Division <br />sent a follow-up letter requesting submittal of the necessary information. To <br />date, we have received no reply from Peerless Resources. <br />If additional information is required, please contact me. <br />/ljc <br />9886E <br />