Laserfiche WebLink
r <br />Mr. Vern Pfannenstiel - 2 - January 14, 1986 <br />until it can be shown that the numbers presented in the 1985 survey are <br />consistent. The southeast pond had a large open pit upstream which collected <br />most of the sediment generated until last year. Sediment yield measured in <br />this pond is most likely not reflective of future sediment yields. <br />The information presented in your response letter should be corrected or <br />verified as per my comments and submitted for insertion into the permit. <br />My transfer to the Minerals Section has become effective so all future <br />correspondence regarding this should be sent to Steve Renner. It has been a <br />pleasure working with you. If you have any questions, please don't hesitate <br />to call me. <br />Sincerely, <br />~~~ C ' "~ <br />Anne C. Baldrige <br />Reclamation Specialist <br />ACB/srs <br />Enclosure(s) <br />cc: Steve Renner with Enclosure <br />6521E <br />