My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-20_REVISION - M1986160 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986160
>
2006-11-20_REVISION - M1986160 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 12:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986160
IBM Index Class Name
Revision
Doc Date
11/20/2006
Doc Name
Reclamation Liability Update - 2006
From
DRMS grm
To
Sunnyside Gravel Mine
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT <br />Machine I Total ~, Fleet Size ~ Haul Trip ~ Return Trip <br />Description jCosVhour/unit j (No. units) 'CosUhrlfleet j Cost/hr/tleet <br />-Flatbed Truck, 4x2. 30K GVW ~ 3.85 'I 1 <br />$53.85 353.85 <br /> i <br />Subtotals :~ $53.85 ~ $53.85 <br />EQUIPMENT HAUL DISTANCE and TIME <br />sheet 2 of 2 <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cvcle Time : Non- Total one-way travel distance : 35.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost ` : $1,570.46 <br />Return time (hours) = 1.00 1.00 'two round trips with haul rig <br />Loading time (hours) = 0.50 ~ NA Total roadable mob/demob cost " : $107.70 <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 3.00 2.00 <br />JOB TIME AND COST Total job time : 6.00 hours <br />Total job cost : $1,678 <br />
The URL can be used to link to this page
Your browser does not support the video tag.