Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 06a State :Colorado PermiUjob # : M-1986-160 <br />Date : 11/20/2006 County :Mesa Abbreviation :none <br />User : GRM Site : Sunnyside Gravel Mine Filename : M160-O6a <br />Permit or otherjob action :Reclamation Liabilry Update - 2006 <br />Task description :Initial Mobilization to site <br />EQUIPMENT TRANSPORT RIG COST <br />Truck tractor description <br />Truck trailer description <br />NON-ROADABLE EQUIPMENT <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1OOT) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />OwnershipcosUhour: $16.63 ~ $18.37 $22.33 <br />Operating cosUhour : $44.38 $46.13 $50.07 <br />Operator cost/hour. $27.66 ~ $27.66 $27.66 <br />Helper cosUhour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />CosUfleet <br />-Cat DSR Series II - 8U (200 52.30 $51.44 $725.45 1 $176.89 $125.45 $0.00 <br /> <br />-reveg tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 ~ $0.00 <br /> <br /> <br /> I -- <br />-- --- <br /> <br /> <br /> -- - - <br /> <br /> <br /> <br />- --- I <br /> <br />--- i I -- <br />- <br />- i <br /> I -~ <br />- i ii -- <br /> ~-- - <br />_ ~ ~ <br /> <br />~ <br />~ _ <br />Subtotals : $285.56 ~ $214.12 $0.00 <br />sheet 1 of 2 <br />