My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29419
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:26 PM
Creation date
11/21/2007 12:15:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
5/17/1993
Doc Name
Letter and Settlement Agreement
From
DMG
To
THE PITTSBURG & MIDWAY COAL MINING CO
Violation No.
CV1993025
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORP~DO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Shermar. 8t.. Room 215 <br />Denver, CO A0203 <br />Phone: (3031 A66-3567 <br />FAX:13031832-8106 <br />SETTLEMENT AGREEMENT <br />Cessation Order No. N/A Notice of Violation No. C-93-025 <br />Mine Name: Edna Strip Mine Permit No.: C-80-001 <br />Permittee: Pittsburg & Midway Coal Mining Company <br />Mailing Address: P.O. Box 176, Oak Creek, Colorado 80467 <br />Operator <br />(If Other than Permittee) <br />Mailing Address: same <br />County: Routt <br />same <br />Type of Mine: Surface/federal <br />II pF Cp~O <br />0 <br />•\ b <br />amr- <br />~ i lB 6 ~ <br />Roy Ramer <br />Governor <br />Michael B. Long <br />Division Director <br />The Division of Minerals and Geology ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on May 11, 1993, the Division and the <br />operator hereby agree as follows: <br />1. The amount of the penalty shall be $500.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(4). <br />DATE: <br />OPERATOR <br />By <br />DATE: _,;~'.~ /.: <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4>(c>] <br />C.R.S. 34-33-123(8)(c)(d) <br />DIVISION.OF~f~-M~RRLS AND.GEOLO <br />i ~i/ '~ <br />By r'~ c ~,.'. <br />" Conference Officer <br />Division <br />DTM/ern 7534E <br />
The URL can be used to link to this page
Your browser does not support the video tag.