Laserfiche WebLink
(~ <br />III. Comments - Compliance <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supDOrting the enforcement action. <br />control contamination of the drain by topsoil, etc. 'Che fill drain will <br />be keyed in for its entire length. <br />As permitted, lifts will be from 50 to 100 feet in height to alloy. for <br />natural sorting of material resulting in natural drainage. ~o filter <br />fabric will be used permanently on ttre drain. <br />The mine is documenting all phases of construction (available for <br />inspection. <br />*An engineer must verify the presence of shallow bedrock prior to <br />construction of the underdrain. Should this turn out not to be the case, <br />a report would need to be made to the Division and agreement reached <br />prior to construction of the underdrain. _ <br />7~r ~ <br />B o n d i n g ~j ~ "'~"'^""~ <br />/FJ~ <br />Operator needs to submit new permit language referring to bond <br />c.alctrlations visa vi final bond liabilit5° as referred to in Division's <br />Findings Document for PR-O1. <br />1991 Oil Saill <br />Colowyo reports that they have been working diligently to get Texaco Uil <br />to reclaim the site of the spill to the necessary standards; particularly <br />as they- apply to reclamation of the access road, diversion ditch and dam <br />site. The llivision has offered to assist Colowyo, as needed, iri this <br />effort. <br />South Grazing Fence <br />operator repo is contract ~oin~ out soon to construct Fence this Eall. <br />