My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-12_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2007-10-12_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:26 PM
Creation date
11/21/2007 12:12:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
10/12/2007
Doc Name
Cost summary form
From
Sunday Mine
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />State :Colorado PermiUjob # : M-1977.285 <br />County :San Miguel Abbreviation :none <br />Site : Suntlay Mine Filename : M285-108 <br />Agency or organization name :DRMS <br />Permit or other job action :Amendment 2 <br />Task description : RIR compacfion on new vent access roads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R DS Sedes II - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $46.68 NA <br />Dozer operating cosUhour : $28.79 100 <br />Ripper operating cosUhour : $4.17 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $112.42 Total fleet cosUhour : $112.42 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 2.65 acres Rip depth (ft) <br />Selected estimating method : Area <br />NA Bank volume : NA <br />1.00 Volume : 4,275 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :application <br />Source of estimated load factor:NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeVsecond ~ Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,217.54 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 7,200 feet <br />Average ripping width : 6.50 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.755 acres/hour Adjusted unit production : 1,010.56 cu. yds./hour <br />Unadjustetl production : 1,217.54 cu. yds./hour Adjusted fleet production : 1,010.56 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Totai job time : 4.23 hours <br />Unit cost : $0.111 per cu. yd, Total job cost : $476 <br />
The URL can be used to link to this page
Your browser does not support the video tag.