My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-12_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2007-10-12_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:26 PM
Creation date
11/21/2007 12:12:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
10/12/2007
Doc Name
Cost summary form
From
Sunday Mine
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 109 State : Co/oratlo Permit/job# : M-1977-285 <br />Date : 10/12/2007 County :San Miguel Abbreviation :none <br />User : RCO Site :Sunday Mine Filename : M285-109 <br />Agency or organization name :DRMS <br />Permit or other job action :Amendment 2 <br />Task description :New vent access roads: <br />HOURLY EQUIPMENT COST <br />and <br />Basic machine :Cat O7R DS Senes II - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.36 NA <br />Operating cosVhour : $56.19 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosVhour : $32.78 NA <br />Total unit cost/hour : $137.33 Total fleet cosUhour : $137.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,140 LCY factor : NA volume : 2,14D LCY <br />Source of estimated volume :6" avg depth x 9634 LF <br />Source of estimated swell facfor : NA <br />edition Correction Factors Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 854.1 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (F <br />Average site altitude : 7,200 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock- 25% Rock, 75% Earth <br />Operator skiN : 0.75 (avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/day <br />Spoil pile : 0.70 (fnd-mfJ <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.010 (S/SU/U) <br />Net correction : 0.45 <br /> <br />Adjusted unit production : 387,48 LCYlhr <br />Adjusted fleet production : 387.48 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.52 Hour; <br />Unit cost : $0.354 /LCY Total job cost : $758 <br />
The URL can be used to link to this page
Your browser does not support the video tag.