My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29108
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:12 PM
Creation date
11/21/2007 12:09:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Enforcement
Doc Date
12/31/1984
Doc Name
Minutes on CV1984113 & CV1984116
Violation No.
CV1984113
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINUTES, DECEMBER, 1984 <br />PAGE 22 <br />AGENDA ITEM 78 - FORMAL PUBLIC HEARING, ROCKCASTLE COMPANY, C-039-81, CONT: <br />NOTICE OF VIOLATION C-84-113 <br />Issued June 15, 1984, Failure to Remove all topsoil from disturbed area. <br />Penalties assessed by staff totalled $500. <br />It was MOVED that the Board confirm the Notice of Violation. SECONDED and <br />PASSED UNANIMOUSLY. <br />It was MOVED that the Board confirm the amount of penalty assessed by the <br />Division. SECONDED and PASSED UNANIMOUSLY. <br />NOTICE OF VIOLATION C-84-116 <br />Failure to place spoi material so as to minimize off-site effects. Penalty <br />assessed by the Division was X450. <br />Operator withdrew from the appeal process, no Board action. <br />Board recessed for lunch. <br />FRIDAY AFTERNOON, BOARD MEMBERS PRESENT: <br />Lee Campbell, Margie Winter, Davis Holder, Sherman Bloch and Terry O'Connor. <br />FOR THE RECORD: At the request of Mr. Korb, Attorney representing Rockcastle <br />Company, it was determined that Agenda Item 78, Formal Public <br />Hearing would remain in recess until after Agenda Item 79 has <br />been heard. <br />AGENDA ITEM 79 - FORMAL PUBLIC HEARING, ROCKCASTLE COD1PANY, FILE N0. C-039-81 <br />All persons wishing to present testimony were sworn. <br />Staff presentation was made by Coal Supervisor, Fred Banta, indicating that <br />the Division made a Proposed Decision and Findings of Compliance for the <br />Rockcastle Company Grassy Gap Mine with 13 stipulations. Stipulations 1 thru <br />12 have been resolved. The issue before the Board at this hearing is the <br />resolution of the bond amount (Stipulation 13). <br />Introductory statements were heard from Dan Mathews, Reclamation Specialist <br />for the Mined Land Reclamation Division and from Mr. Mark Korb, representing <br />Rockcastle Company. During these presentations the Division submitted <br />ATTACHMENT S, Exhibits 1 thru 10, miscellaneous docwnents from the permit <br />file, Exhibit 11, Caterpillar Performance Handbook Edition 13, and Exhibit 12, <br />Rental Rate Blue Book for Construction Equipment. Rockcastle Company <br />submitted ATTACHMENT T, Exhibits 1 and 2, correspondence relating to the <br />permit and o~n~caTcuCations. The map used in the formal public hearing, <br />Agenda Item 78, was also referred to in these presentations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.