Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 012 <br />Date : 06/07/2006 <br />User : KAP <br />State :Colorado PermiUjob# : M-1999-117 <br />County :Saguache Abbreviation :none <br />Site :Colorado Gravel Products Filename :M117-D12 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Bond Recalculation related to Insp~ <br />Task description :Spread Topsoil on Pit SIoF <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series Il <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $53.92 NA <br />Operating cost/hour : $75.29 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $161.74 Total fleet cosUhour : $161.74 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,947 CCY factor : 1.125 volume: 2,190 LCY <br />Source of estimated volume :Reclamation Plan (1800 LF slope x 80'slope length x 4"deep <br />Source of estimated swell factor :Cat Handbook (Partially consolidated stockpile) <br />HOURLY PRODUCTION <br />Average push distance : 60 feet <br />Unadjusted hourly production : 1,246.9 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Drv packed <br />20.00 % (i <br />7.690 feet <br />2.550 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.43 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.70 <br />Adjusted unit production <br />Adjusted fleet production <br />878.36 <br />878.36 <br />Source <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.49 Hours <br />Unit cost : $0.184 /LCY Total job cost : $403 <br />8SU Horsepower: 310 <br />