Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 011 State :Colorado Permit/jpb# :M-1999-117 <br />Date : 06/07/2006 County : Saguache Abbreviation :none <br />User : KAP Site :Colorado Gravel Products Filename : M117-011 <br /> <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description :$pread Topsoil On Pit Floor <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series ll - 8SU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br /> Operating cosUhour : $75.29 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cost/hour : $161.74 Total fleet cosUhour : $161.74 <br /> <br />MATERIAL QUANTITIES ~ ~ ~~ <br />Initial Swell Loose <br />volume: 8,584 LCY factor: NA volume: 8,584 LCY <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :Cat Handbook (E. <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (i <br />Average site altitude : 7,690 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.474 /LCY <br />Pack) <br />condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Jab efficiency : 0.83 (lshift/day <br />Spoil pile : 0.80 (ind-rfl <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.54 <br /> <br />Adjusted unit production : 341.41 LCYIhr <br />Adjusted fleet production : 341.41 LCY(hr <br /> <br />Total job time : 25.14 Hours <br />Total job cost : $4,067 <br />