My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-07_REVISION - M1999117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999117
>
2006-06-07_REVISION - M1999117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:41 AM
Creation date
11/21/2007 12:07:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Revision
Doc Date
6/7/2006
Doc Name
Bond Recalculation related to Inspection
From
DMG
To
DMG
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 011 State :Colorado Permit/jpb# :M-1999-117 <br />Date : 06/07/2006 County : Saguache Abbreviation :none <br />User : KAP Site :Colorado Gravel Products Filename : M117-011 <br /> <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description :$pread Topsoil On Pit Floor <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series ll - 8SU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br /> Operating cosUhour : $75.29 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cost/hour : $161.74 Total fleet cosUhour : $161.74 <br /> <br />MATERIAL QUANTITIES ~ ~ ~~ <br />Initial Swell Loose <br />volume: 8,584 LCY factor: NA volume: 8,584 LCY <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :Cat Handbook (E. <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (i <br />Average site altitude : 7,690 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.474 /LCY <br />Pack) <br />condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Jab efficiency : 0.83 (lshift/day <br />Spoil pile : 0.80 (ind-rfl <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.54 <br /> <br />Adjusted unit production : 341.41 LCYIhr <br />Adjusted fleet production : 341.41 LCY(hr <br /> <br />Total job time : 25.14 Hours <br />Total job cost : $4,067 <br />
The URL can be used to link to this page
Your browser does not support the video tag.