Laserfiche WebLink
<br />Battle Mountain Gold <br />NOV Abatement Requirements <br />page 2 <br />include a schedule for implementation. Following approval of his <br />technical revision, BMG shall implement the treatment method i <br />accordance with the plan. Appropriate frequency and distribution of <br />monitoring of the tailings and plant circuit shall be proposed within the <br />application and subsequently conducted to verify the progress ~nd success <br />of the remedial treatment. Monitoring results, covered by an appropriate <br />cover letter report shall be submitted to the Division weekly wring the <br />detoxification program. <br />While BMG is continuing the CYTOX treatment, it will be permit~ed to <br />continue operating the processing plant, including the introdu tion of <br />unprocessed ore, until the projected tailings quality has been achieved. <br />At that point in time BMG will cease operation of the plant pe~ding <br />approval to recommence operation by the Division. Monitoring f cyanide <br />levels within the tailings slurry and liquid shall continue to (verify the <br />anticipated decay of Free Cyanide levels following the cessation of the <br />detoxification program, until cessation is approved by the Division. <br />The introduction of chemical compounds into the processing circ it to <br />affect an immediate remedy of the tailings cyanide problem cowl <br />potentially create additional problems by amending the chemical <br />constituency of the tailings. The Division cautions BMG that i~t will be <br />held responsible for any unanticipated results of its remedial Actions. <br />Status: Partiallv Satisfied <br />- BMG submitted T.R. Application on April 3, 1992. <br />- Division approved TR-004 on April 7, 1992 ith <br />three stipulations. Stipulation #3, requi ing two <br />additional monitoring points, has been satisfied. <br />MLRB Amendment: The Division shall report tailings treatment progress <br />to the Board during their May 27-28 and June 24-25, 1992 ~eetings. <br />Tailings CYTOX detoxification approved under Technical Re ision <br />TR-004 shall cease June 24, 1992. <br />av Proaress• - BMG continued CYTOX treatment, in accordance with <br />TR-004 throughout the month of May. <br />- BMG submitted TR-005, to cease operation o~ the <br />A.V.R. unit, following failure of the air parging <br />fan unit on April 29, 1992. The Division pproved <br />TR-005 on May 1, 1992. <br />- In partial response to Stipulation #1 on T -004, BMG <br />submitted plant and pond cyanide monitorin results <br />and technical discussion of the data to de onstrate <br />reduction in Free Cyanide levels from 184-188 ppm <br />to 32-34 ppm in the ponds, as of May 11, 1 92, on <br />May 26, 1992. The Division will complete eview and <br />comment ASAP. Copies will provided to the Parties <br />for comment. <br />