Laserfiche WebLink
<br />Battle Mountain Gold <br />3/31/92 Notice of Probable Violation <br />Abatement Plan Requirements <br />(Permit No: M-88-112) <br />Updated as of May 27, 1992 <br />As abatement for the Notice of Violation issued to Battle Mountain old (BMG) <br />on March 31, 1992, the Mined Land Reclamation Board imposed the fol owing <br />abatement requirements, as proposed by the Division with amendments as noted. <br />(1) Increased Tailings Area Security: <br />BMG shall develop and implement a Tailings Area Security progr m, in <br />order to safe guard the health and safety of the general publi~ and <br />wildlife. The plan shall be submitted to the Division as soon as <br />possible for review and approval. In the interim, BMG shall irt~plement <br />whatever increased surveillance it deems appropriate to control, the site. <br />Status: Implemented - BMG submitted acceptable proposal April 3, 1992, <br />and implemented increased security immediately. <br />(2) Assessment of Environmental Impact: <br />BMG shall review all available environmental monitoring data collected to <br />date, including its approved ground and surface water monitorin sites, <br />air quality monitoring sites, the collection pond leak detectio system, <br />the processing plant circuit, and any other applicable monitori g <br />facilities. A report summarizing its findings shall be submitt d to the <br />Division by Friday, April 10th. <br />Status: Satisfied - BMG submitted acceptable report April 13, 1992. <br />(3> Accelerated Frequency of Environmental Monitoring: <br />The frequency of monitoring of the environmental monitoring facilities <br />referenced in item (2) above shall be accelerated to bi-weekly, <br />commencing immediately. The initial samples shall be submitted to an EPA <br />certified laboratory for "rush" analysis. Subsequent samples m~y be <br />processed normally. Accelerated sampling shall continue until relaxation <br />is approved by the Division. <br />The results of each set of sample analyses, covered with an appropriate <br />brief summary letter report, shall be submitted to the Division within <br />three days following completion of the analyses by the laboratory. <br />Status: Implemented - BMG is complying with the accelerated fr quency. <br />- BMG requested relaxation on April 16, 19 2. <br />- The Division has declined to approve rel xation. <br />(4) Tailings Cyanide Detoxification: <br />BMG shall develop and submit a plan for cyanide detoxification oIf the <br />entire slurry and liquid contents of the tailings impoundment as soon as <br />possible for review and approval by the Division. This plan shall be <br />submitted as a technical revision application. This application shall <br />