My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28860
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:02 PM
Creation date
11/21/2007 12:04:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
7/2/1997
Doc Name
Operator Comment Letter
From
THE PITTSBURG & MIDWAY COAL MINING CO
To
DMG
Violation No.
CV1997007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Information Submitted by P&M <br />Regarding Notice of Violation C-97-007 <br />Nature of Violation: <br />Failure to prevent contributions of suspended solids to streamflow or runoff outside the permit <br />area; failure to pass disturbed area runoff through a sediment pond; failure to ensure that the <br />construction, maintenance, and post-mining condition of access roads will control or prevent <br />erosion and siltation; failure to clean out temporary or large settling ponds from drainage after <br />disturbed areas are revegetated and stabilized; failure to stabilize and protect all surface areas <br />affected by the surface mining ojcoal and reclamation operations to effectively control erosion; <br />failure to minimize disturbances to the prevailing hydrologic balance. <br />P&M does not contest the nature of the violation as presented above with the exception of the <br />language which states, "failure to clean out temporary or lazge settling ponds from drainage afer <br />disturbed areas are revegetated and stabilized": P&M believes this language (found in the Act, <br />34-33-120(2)(j)(III) is inappropriately used. The language at 34-33-120(2)(j)(III) clearly states, <br />"Cleaning out and removing. temporary or large settling ponds... [emphasis added]". It is P&M's <br />belief that this language is intended to be used during Phase' II bond release procedures (i.e., <br />when a temporary structure may be removed upon establishment of revegetation and hydrologic <br />stabilization) and as cited at Rule 4.05.17, Postmining and Rehabilitation of Sedimentation <br />Ponds, Diversions, Impoundments, and Treatment Facilities; "Before abandoning the permit <br />area, the person who conducts the surface or underground mining activities shall renovate all <br />permanent sedimentation ponds...". P&M is certain that the areas cited in the NOV cannot be <br />considered revegetated or stabilized in accordance with bond release procedures nor is P&M <br />intending to abandon the permit area. <br />The Division's use of [he citation implies that shortly afer an area being serviced by a sediment <br />structure is seeded (the areas cited in the NOV were seeded as recently as November 1996) the <br />pond is required to be cleaned and removed. P&M does not believe the Act nor the regulations <br />require sedimentation structures to cleaned in concert with specific reclamation activities such as <br />final seeding. <br />Portion of the Operation to which the Notice applies and Steps Necessary to abate <br />Violation: <br />West Ridge Road, "Super Curve" area <br />la. Devise acrd install drainage system to alleviate erosion on "s:rpercurve"by installing a <br />temporary ditch to transport all drainage water from the road ditches to the ditch on south <br />side of road; (abatement date required - 27 June 1997) <br />
The URL can be used to link to this page
Your browser does not support the video tag.